PrintPathshalaStart Assessment
📦 Vertical · Corrugation

High Volume, Thin Margin. Corrugation Punishes Waste More Than Any Other Vertical.

When margin per box is measured in paise, wastage is not a housekeeping issue — it is the business. A trim decision made badly, repeated across a month of production, is the difference between a profitable plant and a busy one.

How It Actually Runs

What Makes Corrugation Different

Corrugation runs on volume. The plant is busy, the machines are loaded, and everyone is working — which makes it very easy to assume things are going well. But utilisation is not profit, and a corrugator running at full speed on a badly planned combination is losing money faster, not slower.

Paper is the largest cost and the least controlled. Grain direction, flute combination and deckle planning decide how much of every reel becomes a box and how much becomes trim. Those decisions are usually made by one experienced person, quickly, without any record of what was chosen or why.

After It Is Running

What Changes

  • Trim and set-up waste attributed to the job and machine that caused it
  • Deckle and grain decisions recorded, reviewed and improved
  • Board ageing visible before it becomes a write-off
  • Machine utilisation read against output, not just running hours

See What This Looks Like On Your Floor

The 30-Day Automation Assessment is built around your actual plant, not a generic corrugation template.